Model Number: | 125*R275B-90° |
MOQ: | 1 |
Price: | $70 |
Delivery Time: | 7 work days |
Payment Terms: | D/P, T/T |
Concrete Pump Pipeline Double-layer Elbow 125*R275B-90° | |
Name | Double-layer elbow of pump truck |
Place of origin | Changsha, Hunan, China |
Applicable model | Sany,Zoomlion concrete pump truck |
Specifications and models | 125*R275B-90° |
Specification size | 415*200*150mm |
Weight | 18KG |
Hardness | High chromium cast iron HRC65 |
Quality assurance | 60000m³ |
Material | High chromium cast iron |
Supply capacity | 800 Pieces/month |
Packing | Export standard packing 415*200*150mm |
Minimum order | 1 |
Price | $70 |
Product features and advantages:
1,Strong wear resistance, safety and explosion protection.
2,Automatic welding, stable quality
3,Patented formula, special process
Maintenance method:
1,After the operation, please clean the pipeline in time.
2,When assembling, accurately align the pipe mouth of the pipeline, and fix the pipe clamp firmly, which can prolong the service life of the flange.
3,When pumping about 30,000 cubic meters of concrete, please turn the elbow around for use.
Model Number: | 125*R275B-90° |
MOQ: | 1 |
Price: | $70 |
Packaging Details: | Export standard packing 415*200*150mm/Pcs |
Payment Terms: | D/P, T/T |
Concrete Pump Pipeline Double-layer Elbow 125*R275B-90° | |
Name | Double-layer elbow of pump truck |
Place of origin | Changsha, Hunan, China |
Applicable model | Sany,Zoomlion concrete pump truck |
Specifications and models | 125*R275B-90° |
Specification size | 415*200*150mm |
Weight | 18KG |
Hardness | High chromium cast iron HRC65 |
Quality assurance | 60000m³ |
Material | High chromium cast iron |
Supply capacity | 800 Pieces/month |
Packing | Export standard packing 415*200*150mm |
Minimum order | 1 |
Price | $70 |
Product features and advantages:
1,Strong wear resistance, safety and explosion protection.
2,Automatic welding, stable quality
3,Patented formula, special process
Maintenance method:
1,After the operation, please clean the pipeline in time.
2,When assembling, accurately align the pipe mouth of the pipeline, and fix the pipe clamp firmly, which can prolong the service life of the flange.
3,When pumping about 30,000 cubic meters of concrete, please turn the elbow around for use.