Send Message
Good price online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Concrete Pump Spare Parts
Created with Pixso. Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

Brand Name: Changsha Tongchuang Mechanical
Model Number: 125*R300-50°+1174mm
MOQ: 10
Price: $125
Delivery Time: 7 work days
Payment Terms: D/P, T/T
Detail Information
Place of Origin:
Changsha, Hunan, China
Name:
Pump Truck Double-layer Lengthened Elbow
Product Name:
Pump Tube Elbow
Applicable Model:
Concrete Pump Truck
Specifications And Models:
125*R300-50°+1174mm
Specification Size:
1100*148*148mm
Weight:
35KG
Material:
Cast Steel
Hardness:
≥HRC63
Packaging Details:
Export standard packing 1100*148*148mm
Supply Ability:
800 Pieces/month
Highlight:

Double Layer Concrete Pump Spare Parts

,

Concrete Pump Spare Parts Elbow

,

Lengthened pipeline elbow

Product Description

Concrete Pump Pipeline Double-layer lengthened elbow 125*R300-50°+1174mm

 

 

Concrete Pump Pipeline Double-layer lengthened elbow 125*R300-50°+1174mm
Name Pump truck double-layer lengthened elbow
Product name Pump Tube Elbow
Place of origin Changsha, Hunan, China
Brand name Changsha Tongchuang Mechanical
Applicable model Concrete pump truck
Specifications and models 125*R300-50°+1174mm
Specification size 1100*148*148mm
Weight 35KG
Hardness ≥HRC63
Quality assurance(m³) 80000
Material Cast steel
Supply capacity 800 Pieces/month
Packing Export standard packing 1100*148*148mm
Minimum order 10
Price $125

 

 

Product features and advantages:

Unique material selection, optimized process, reliable processing and high cost performance!

 

 

Maintenance method:

Check whether there is water leakage or slurry leakage at the joint of the pipe clamp in time, replace the seal in time if there is, and visually check the wear of the flange.

 

 

Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow 0

Good price online

Products Details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Concrete Pump Spare Parts
Created with Pixso. Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

Brand Name: Changsha Tongchuang Mechanical
Model Number: 125*R300-50°+1174mm
MOQ: 10
Price: $125
Packaging Details: Export standard packing 1100*148*148mm
Payment Terms: D/P, T/T
Detail Information
Place of Origin:
Changsha, Hunan, China
Brand Name:
Changsha Tongchuang Mechanical
Model Number:
125*R300-50°+1174mm
Name:
Pump Truck Double-layer Lengthened Elbow
Product Name:
Pump Tube Elbow
Applicable Model:
Concrete Pump Truck
Specifications And Models:
125*R300-50°+1174mm
Specification Size:
1100*148*148mm
Weight:
35KG
Material:
Cast Steel
Hardness:
≥HRC63
Minimum Order Quantity:
10
Price:
$125
Packaging Details:
Export standard packing 1100*148*148mm
Delivery Time:
7 work days
Payment Terms:
D/P, T/T
Supply Ability:
800 Pieces/month
Highlight:

Double Layer Concrete Pump Spare Parts

,

Concrete Pump Spare Parts Elbow

,

Lengthened pipeline elbow

Product Description

Concrete Pump Pipeline Double-layer lengthened elbow 125*R300-50°+1174mm

 

 

Concrete Pump Pipeline Double-layer lengthened elbow 125*R300-50°+1174mm
Name Pump truck double-layer lengthened elbow
Product name Pump Tube Elbow
Place of origin Changsha, Hunan, China
Brand name Changsha Tongchuang Mechanical
Applicable model Concrete pump truck
Specifications and models 125*R300-50°+1174mm
Specification size 1100*148*148mm
Weight 35KG
Hardness ≥HRC63
Quality assurance(m³) 80000
Material Cast steel
Supply capacity 800 Pieces/month
Packing Export standard packing 1100*148*148mm
Minimum order 10
Price $125

 

 

Product features and advantages:

Unique material selection, optimized process, reliable processing and high cost performance!

 

 

Maintenance method:

Check whether there is water leakage or slurry leakage at the joint of the pipe clamp in time, replace the seal in time if there is, and visually check the wear of the flange.

 

 

Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow 0