Brand Name: | Putzmeister |
Model Number: | Isuzu 38 meter |
MOQ: | 1 |
Price: | Negotiatable |
Delivery Time: | 50 work days |
Payment Terms: | D/P, T/T, L/C, D/A |
Re-manufactured Truck-mounted Concrete Pump 38 meter
Re-manufactured Truck-mounted Concrete Pump 38 meter | |
Name | Truck-mounted Concrete Pump |
Origin | Changsha,Hunan,China |
Brand | Putzmeister |
Specifications | Isuzu 38 meter |
Emission Standard | National Grade Ⅲ |
Packing | Standard Export Package |
Color | Yellow + red |
Chassis | ISUZU |
Vehicle Weight | 28500KG |
Vertical Reach | 38 meters |
Horizontal Reach | 33.1 meters |
Features and advantages:
This 4 booms Z-folded universal pump truck shows great comprehensive performance. TRDI outriggers are compact, use a minimum of space, opens quickly and stands firmly. Its pump's output capacity can be up to 160 cubic meters per hour. Compact structure of 3-axle-Chassis which works flexiblely and suitable for various building site including narrow areas, buildings, tunnels, bridges and workshops, etc.
Brand Name: | Putzmeister |
Model Number: | Isuzu 38 meter |
MOQ: | 1 |
Price: | Negotiatable |
Packaging Details: | Standard Export Package |
Payment Terms: | D/P, T/T, L/C, D/A |
Re-manufactured Truck-mounted Concrete Pump 38 meter
Re-manufactured Truck-mounted Concrete Pump 38 meter | |
Name | Truck-mounted Concrete Pump |
Origin | Changsha,Hunan,China |
Brand | Putzmeister |
Specifications | Isuzu 38 meter |
Emission Standard | National Grade Ⅲ |
Packing | Standard Export Package |
Color | Yellow + red |
Chassis | ISUZU |
Vehicle Weight | 28500KG |
Vertical Reach | 38 meters |
Horizontal Reach | 33.1 meters |
Features and advantages:
This 4 booms Z-folded universal pump truck shows great comprehensive performance. TRDI outriggers are compact, use a minimum of space, opens quickly and stands firmly. Its pump's output capacity can be up to 160 cubic meters per hour. Compact structure of 3-axle-Chassis which works flexiblely and suitable for various building site including narrow areas, buildings, tunnels, bridges and workshops, etc.